Reports and Financial Statements
2020 Reports
2019 Reports
- AWS Financial Statements
- ERWS Financial Statements
- AWS Management Board Update - September 5
- ERWS Management Board Update - September 5
2018 Reports
2016 Reports
Draft Predesign Report (Update) - CH2MHILL- Appendix A - Transmission Main Drawings
- Appendix A - WTP and Intake Drawings
- Appendix B - Permitting Requirements
- Appendix C - Intake Hydrology
- Appendix D - Arrowsmith Dam
- Appendix E - Intake Pump Station and Transmission Mains
- Appendix F - Water Quality
- Appendix G - Distribution Upgrades
- Appendix H - Water Model
- Appendix I - Project Implementation
- Appendix J - Aquatic Effects
- Appendix K - Geotech
- Appendix L - Archaelogical Overview
- Appendix M - Phasing Options
- Appendix N - Detailed Cost Estimate
- Appendix O - Membrane Equipment
- Predesign Report Body - Update December 2015
2015 Reports
- Authorization for a Fisheries Act Application
- ERWS - 2010-2014 Costs (including Parksville and RDN allocation)
2014 Reports
- AWS/ERWS Intake Study - Phase 1 Conceptual Planning
- DFO Request for Review - December 2014
- LGL - Aquatic Effects Assessment
- CH2MHILL - Intake, Raw Water Pump Station and Transmission Mains
- AWS/ERWS Letter - December 11, 2014
- CH2MHILL - Intake Hydrology and Hydraulics
- CH2MHILL - Arrowsmith Lake Reservoir Water Supply
- Kerr Wood Leidal - Distribution System Upgrades - Water Demands
- Kerr Wood Leidal - Distribution System Upgrades - Water Modelling
- Water Treatment Plant - Reduced Scale Options, Technical Report
- Water Intake, Treatment Plant and Supply Mains – Final Predesign Report CH2MHILL
- Appendix A - Drawings.pdf
- Appendix B - Permitting Requirements.pdf
- Appendix C - Intake Hydrology and Hydraulics.pdf
- Appendix D - Arrowsmith Lake Reservoir Water Supply.pdf
- Appendix E - Intake, Raw Water Pump Station and Transmission Mains.pdf
- Appendix F - Raw Water Quality Sampling.pdf
- Appendix G - Distribution System Upgrades - Water Demands.pdf
- Appendix H - Distribution System Upgrades - Water Modeling.pdf
- Appendix I - Project Implementation.pdf
- Appendix J - Aquatic Effects Assessment.pdf
- Appendix K - Pre-Design Geotechnical Investigation.pdf
- Appendix L - Archaeological Overview Assessment.pdf
- Appendix M - Detailed Cost Estimate.pdf
- Technical Report #1 - Completion of Phase 2 Aquifer Storage and Recovery Testing Program
- Technical Report #2 - Phase 2, Water Treatment Pilot Testing and ASR Feasibility Analysis
2012 Reports
- Estimated Capital Project Costs - From Staff Presentation to City of Parksville Council - November 20, 2012
- AWS Public Information Report, March 6, 2012 (6.0MB)
AWS Final Summary Report – April 2011
- AWS Final Summary Report – April 2011 (Part 1 ~ 10MB)
- AWS Final Summary Report – April 2011 (Part 2 ~ 10MB)
- 2-1 Watershed management
- 3-1 Population forecasts
- 3-2 Water demands
- 3-3 Water supply capacity
- 4-1 Rain water quality
- 4-2 Drinking water quality criteria
- 4-3 Treatment process options
- 4-4 Water treatment site development considerations
- 5-1 Existing groundwater supply evaluation and aquifer yield assessment
- 5-2 Aquifer storage recovery
- 6-1 Watershed hydrology assessment
- 6-2 Development of a list of potential intake sites
- 8-1 Comparison of intake and water treatment plant siting options:
- 8-2 Triple bottom line and risk siting option analysis
